January 2012

620true thumbnails under 350false 800http://globalminerals.com/wp-content/plugins/thethe-image-slider/style/skins/white-rounded
  • 6000 slideright true 30 bottom 50
    entrance
    At the entrance to the mine before and after the rehabilitation in 2012.
  • 6000 slideright true 30 bottom 50
    decline
    Haulage tunnel junction flooded, 2011 and cleaned up in 2012.
  • 6000 slideright false 60 bottom 0
    Slide4
  • 6000 slideright false 60 bottom 0
    Slide5
  • 6000 slideright false 60 bottom 0
    Slide6
  • 6000 slideright true 30 bottom 50
    Slide7
    Hoist Drums prior to rehabilitation
  • 6000 slideright true 30 bottom 50
    Slide8
    Hoist Drums prior to rehabilitation
  • 6000 slideright false 60 bottom 0
    Slide9
  • 6000 slideright true 30 bottom 50
    Slide10
    Building a water treatment facility
  • 6000 slideright true 30 bottom 50
    Slide11
    Building a water treatment facility
 
 
 
 
 
 
 
 
 
 
Explore Our Gallery

Downloads

Powerpoint Presentation


Factsheet Download


34073902-1